Benetti B.Now 67M enters outfitting stage

Benetti shipyard has shared more details on the construction of the 67-metre superyacht known as project FB289, which is due to hit the water in the summer of 2026
May 21 2024 • by Olga Selezneva 3 minutes to read
324
Benetti B.Now 67M has a steel hull and an aluminum superstructure

Outfitting work has started at Benetti Livorno shipyard on the new 67-metre yacht, built on the basis of the customizable Benetti B.Now 67M platform

The exterior design of this steel six-deck yacht was developed by RWD studio, and the interior is owed to Reymond Langton Design.

One of the six decks is reserved exclusively for the owner, represented by West Nautical. Benetti B.Now 67 platform is an excellent example of a highest level of customization, implying close collaboration of the shipyard with the owner’s representatives during the entire construction process. This is the way the best and most unique yachts come into being. According to Benetti, an extremely synergic relationship was established with West Nautical right from the very start of the construction, which might be taken as a promise of a great result. The yacht is due to be delivered in the summer of 2026.  

Benetti B.Now 67M has a steel hull and an aluminum superstructure
Benetti B.Now 67M has a steel hull and an aluminum superstructure

In addition to the private owner’s deck, this Benetti B.Now 67M unit features an observation deck and a bridgedeck with an outdoor aft area. On the main deck there is a spacious lounge, a lobby, guest cabins, and an outdoor pool. Below deck there is a gym, crew quarters, a galley, a tender garage and an engine room. The bottom ‘tank deck’ is reserved for all the services: there is a freezer/fridge room, a laundry, storage rooms, etc.

Benetti B.Now 67M (FB289)
Benetti B.Now 67M (FB289)

According to Geoff Moore, West Nautical Managing Director, “West Nautical, having brokered the deal for the owner to make the purchase, are greatly enjoying the build process at Benetti and working alongside the interior design team at Raymond Langdon Design. During the first phase of the build with the steel and aluminium construction work, it was great to oversee the project between Benetti and their suppliers. Now the outfitting work starts at Benetti’s Livorno shipyard for two years of work before her delivery, which will be closely overseen by our on-site project managers”. 

Sign up to our newsletters
Sign up to ilodka.com email newsletters to keep abreast of the most significant news and events in the world of yachting, get analytical and feature articles and updates on new launches
Thank you!
You have successfully subscribed to our newsletter
Olga Selezneva
Author
Olga Selezneva
Rate the article
Any questions about the article?
Related stories
Jan 22 2025 ⬥ Projects
At the boat show in Düsseldorf, the British shipyard has unveiled the 41-metre Sunseeker 135 project
Jan 21 2025 ⬥ Projects
At the boat show taking place in Düsseldorf now, the Turkish shipyard has announced the upcoming debut of its Sirena 60 flybridge motor yacht
Jan 20 2025 ⬥ Projects
At the boat show in Düsseldorf running from 18 to 26 January 2025, the British shipyard has revealed the details on its new motor yacht that is scheduled for launch this April
Jan 17 2025 ⬥ Projects
South African Southern Wind shipyard is working on its largest to date 37.46 sailing superyacht project
Order an article
You can make your contribution to the development of our project - offer the Editorial Board of ilodka.com portal to create a material on the yachting topic you are interested in and become its sponsor.
Other news
Next article
Mishi Yachts announces premiere of Mishi 102
The young sailing yacht brand from Turkey is to unveil their new 31-metre superyacht at the nearest Monaco Yacht Show
May 21 2024