Contract signed for new 29-metre Sanlorenzo SL96 Asymmetric

The delivery of the new hull in the series is scheduled for October 2025
August 8 2024 • by Olga Selezneva 2 minutes to read
238

It is a well-known fact that no two Sanlorenzo yachts are the same 

Although formally SL96A is a production model, the level of potential personalization is comparable to that of custom yachts. Thus, the previous SL96A  hull launched early in 2024 featured over 500 modifications compared to the standard model. And as for the new hull, its body will be extended from 29 to 29.3 m. 

Sanlorenzo SL96A’s design was penned by Zuccon International Project and features an asymmetric layout of the main deck. Thanks to the fact that there is no walkway on the portside, the saloon got extended and became considerably larger.

Main deck saloon
Main deck saloon

The yacht offers accommodation for 10 guests in five abins, including a master suite on the main deck. There are also crew quarters for four. The interior of the new Sanlorenzo SL96 Asymmetric unit will be created by Laura Sessa.  

The Sanlorenzo SL96 Asymmetric is equipped with twin MTU M86 engines of 2216 hp each. This ensures a top speed of 28 knots and a cruising speed of 24. The range in a cruising mode is 330 nautical miles, but at 10 knots it goes up to 1250 nautical miles. 

Sign up to our newsletters
Sign up to ilodka.com email newsletters to keep abreast of the most significant news and events in the world of yachting, get analytical and feature articles and updates on new launches
Thank you!
You have successfully subscribed to our newsletter
Olga Selezneva
Author
Olga Selezneva
Rate the article
Any questions about the article?
Related stories
Dec 2 2024 ⬥ Projects
Italian Cantiere delle Marche shipyard has signed the contract for the construction of the 50-metre expedition yacht with a flair for fishing
Nov 29 2024 ⬥ Projects
Following the success of the 28-metre Sexi Me yacht at the autumn boat shows, the Italian shipyard adds two more models to the Otam 90 series: the Hard Top and the T-Top
Nov 28 2024 ⬥ Projects
Dutch Van der Valk shipyard continues works on the second unit of the 19.60-metre weekender
Nov 27 2024 ⬥ Projects
Construction work on the first 23.12-metre hybrid catamaran unit by Italian Wider Yachts shipyard is well underway at Vision Hub facility in Fano
Order an article
You can make your contribution to the development of our project - offer the Editorial Board of ilodka.com portal to create a material on the yachting topic you are interested in and become its sponsor.
Other news
Next article
First Lazzara UHV 90 unit sold
American Lazzara Yachts has signed the contract for the 27-metre UHV 90 featuring unrivalled interior volume
July 31 2024